You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan di Green Garden, Sudin SDA Jakbar Buat Kolam Olakan

West Jakarta SDA Builds Stilling Basin on Jalan Kedoya Raya

West Jakarta Water Resources (SDA) Sub-agency builds stilling basin on Jalan Kedoya Raya to anticipate inundation on Jalan Green Garden, Kedoya Utara, Kebon Jeruk.

We expect stilling basin can drain water to Pisang River to avoid inundation in Green Garden

West Jakarta SDA Sub-agency Head, Purwanti Suryandari conveyed, stilling basin which is built next to gas station (SPBU) has width of 2 meters, height of 3 meters and length of 40 meters.

"We expect stilling basin can drain water to Pisang River to avoid inundation in Green Garden," she said, Monday (11/2).

Three Sluice Gates Installation in Rawa Buaya Targeted to Finish This Month

Currently, she continued, her side is currently building the stilling basin. This project is targeeted to finish in mid November.

Not only building stilling basin, but her side also normalize channel in Green Garden Housing Block A14, RT 012/05. Previously this channel was 50 centimeters wide and 30 centimeters deep, but now it is enlarged into width 150 centimeters and width 1 meter.

"We build stilling basin and enlarge the channel to overcome inundation in Green Garden," she mentioned.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye418 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close